online translation
original
Automatic Identification
English
Chinese
traditional Chinese
Japanese language
Korean
French
Spanish
Thai
Arabic
Russian
Portuguese
German
Italian
Greek
Dutch
Polish
Bulgarian
Estonian
Danish
Finnish
Czech
Romanian
Slovenian
Swedish
Hungarian
Vietnamese
translation
English
Chinese
traditional Chinese
Japanese language
Korean
French
Spanish
Thai
Arabic
Russian
Portuguese
German
Italian
Greek
Dutch
Polish
Bulgarian
Estonian
Danish
Finnish
Czech
Romanian
Slovenian
Swedish
Hungarian
Vietnamese
500
characters can also be entered
Translation results
English translation Spanish (Total
591
Bar)
Reinforcement processing personnel in addition to the general processing personnel, but also equipped with specially trained welders, special types of work must have a work permit. The rebar worker requires proficiency in lashing.
Familiar with drawing → preparation of batching list → review → technical disclosure → blanking and making sample bars → compound ruler → making according to the list → classification and storage → binding and installation → acceptance.
Pouring should ensure vibration compacted, smooth.
When the amount of concrete at a time is ≧7m³, commercial concrete is used, and concrete conveying truck is directly transported to the side of the foundation pit for self-discharge.
After the excavation is completed, party A, supervision engineer, quality inspection, geology and design institute representatives shall check and accept the excavation. Only when the design requirements are met, can the next process of construction be carried out.
The abandoned soil should be piled not less than one meter outside the pit.
In the course of excavation, soft pits and other abnormal soil should be thoroughly dug out and treated with soil replacement or reinforcement. The treatment method should be approved by the design unit.
Excavation should be layered and gradually excavated. When excavated to 30cm away from the bottom of the pit, manual excavation should be used. The edge of the pit groove should be cut neatly according to the stretch line of the pit width, and the horizontal point should be led to the edge of the pit. If the excavation can not continue the next process, 10 ~ 20 cm can be set aside not to dig, to continue the construction, and then dug to the depth of the design requirements.
The excavation line shall be scattered with white ash according to the design foundation section size plus the working face for slope release and formwork installation.
Before excavation, site leveling should be done to remove surface water to ensure smooth roads and no water accumulation on site.
Construction measures: a calibrated DS3 level is selected and measured to the site at the designated base point by the planning department. The calibrated double-sided tower ruler is used for elevation transmission, supplemented by 30m steel tape in line with the national value transmission.
For vertical control of frame column installation, total statione-electronic theodolite function verification is adopted, and DZJ laser verticator is used to control verticality of floor leads..
The axis is controlled by a theodolite, which is arranged on the axis control pile.
After the completion of wiring, sorting out the wiring measurement results map, after the supervision engineer, acceptance and retest without error into the next process.
The project uses DS3 level control level elevation; DZJ laser verticalizer and KTS electronic total station are used to control the axis and verticality. According to the plan, site and construction drawings, the main control axis is lofted outside the foundation excavation line by total station instrument, and the column foundation of foundation is used as the axis control point. The Angle error of theodolite control axis should meet the requirements of 90°±2 "and 180°±4", and the distance erro
List of main construction equipment to be invested, and list of test and testing instruments to be equipped with this section.
In order to ensure the smooth construction of the project, our company will according to the construction machinery equipment table and combined with the actual situation, maintain certain machinery standby.
According to the mechanical plan and the arrangement of the site plan, for the construction machinery, necessary maintenance and inspection, to ensure that the site machinery and equipment in good condition, normal use; In the right time can be timely approach and play a role.
Organize personnel to check supply channels in the market for all kinds of materials needed for the project, communicate with relevant parties, and conclude supply relationship (or contract) as soon as possible according to the design requirements.
According to the material plan, through visits and other ways, determine the qualified material supplier list, and reasonable material delivery time and batch and quality inspection and other contents.
Implement the management personnel of the site project department and the personnel of each construction team, select the best operation team through competition, and carry out the necessary education of safety, technology, fire control and labor discipline in advance.
Organize the staff to put forward the labor demand plan quickly, and organize the staff to prepare the project construction budget.
The project Management Department shall organize the organization to start operation immediately, start all the preparatory work, plan and implement the project construction team, and organize the entry strictly according to the project schedule.
The labor team shall be organized in batches immediately after the main management personnel of the project management Department arrive.
To formulate a series of management systems for engineering technology, quality, safety, fire protection, security, planning, finance, machinery and equipment, materials, on-site civilization, life and welfare.
<<
<
>
Twenty-six language translations
English translation Chinese
English translation traditional Chinese
English translation Japanese language
English translation Korean
English translation French
English translation Spanish
English translation Thai
English translation Arabic
English translation Russian
English translation Portuguese
English translation German
English translation Italian
English translation Greek
English translation Dutch
English translation Polish
English translation Bulgarian
English translation Estonian
English translation Danish
English translation Finnish
English translation Czech
English translation Romanian
English translation Slovenian
English translation Swedish
English translation Hungarian
English translation Vietnamese
Twenty-six language translations
English
中文
繁體中文
日本語
한국어
Français
Español
ไทย
العربية
Русский язык
Portugues
Deutsche Sprache
lingua italiana
Ελληνικά
Ολλανδικά
Polski
Bułgarski
Eesti keel
dansk
suomalainen
Česky
românesc
Slovenščina
Svenska
magyar
Tiếng Việt
Online translation support
English
,
Chinese
,
traditional Chinese
,
Japanese language
,
Korean
,
French
,
Spanish
,
Thai
,
Arabic
,
Russian
,
Portuguese
,
German
,
Italian
,
Greek
,
Dutch
,
Polish
,
Bulgarian
,
Estonian
,
Danish
,
Finnish
,
Czech
,
Romanian
,
Slovenian
,
Swedish
,
Hungarian
,
Vietnamese
, Translations in other languages。
Return home