online translation
original
Automatic Identification
English
Chinese
traditional Chinese
Japanese language
Korean
French
Spanish
Thai
Arabic
Russian
Portuguese
German
Italian
Greek
Dutch
Polish
Bulgarian
Estonian
Danish
Finnish
Czech
Romanian
Slovenian
Swedish
Hungarian
Vietnamese
translation
English
Chinese
traditional Chinese
Japanese language
Korean
French
Spanish
Thai
Arabic
Russian
Portuguese
German
Italian
Greek
Dutch
Polish
Bulgarian
Estonian
Danish
Finnish
Czech
Romanian
Slovenian
Swedish
Hungarian
Vietnamese
500
characters can also be entered
Translation results
English translation Spanish (Total
591
Bar)
Daily 1 to 2 cleaning, cleaning dust and garbage must be handled in time transported to the garbage storage point, shall not be detained, pouring concrete to send personnel to clean the road.
The construction area shall be cleaned regularly every day and sprayed with water in time to ensure the road surface is clean; Daily vehicle feeding, the vehicle must be washed to ensure that the ash does not take out of the site. Office area by special personnel for daily maintenance cleaning work.
The pillars are responsible for the concrete repair and grinding of the building, there are special technical details, the focus is on the dust treatment measures during the grinding, with closed mesh or 100% wet operation, to ensure that the dust control in 3 meters, floor cleaning to clean parts of the wet sprinkling, to prevent dust.
Earth-moving work is directly related to earth-moving work, and special construction plans must be made. Earth-moving work should be carried out in strict accordance with the requirements of closed earth-pulling during the operation. After the work is finished, 100% earth-moving work in the operation area should be guaranteed, and special dust control measures should be taken for the backfill earth-moving part.
Gate on the construction site set up car wash equipment, washing the captain has been installed in accordance with the relevant provisions of 7.5 meters required for the construction site in and out of the car wash the car, tank adopts brick after painting waterproof mortar, in and out of the vehicle the specialist is responsible for the supervision, wash not clean it is forbidden to go out, also equipped with a powerful car washer, auxiliary flushing vehicle more firmly clods.
On both sides of the gate and wall, 3 meters are left as the site notification column. On both sides, the project "civilized construction commitment board" and "dust control measures bulletin board" are respectively set up. Environmental protection supervision column and project overview, construction, design, supervision unit name, project person in charge name, supervision telephone number are posted on the construction site.
The external walls of the prefabricated housing can be used to put up propaganda banners.
The driving road on site is 100% hardened according to the requirements. PM electronic detector is set at the entrance gate. Sprinkler system is set beside the road on site and connected with PM detector.
In the signs at the entrance of the site, the "major adverse environmental factors control sign" is added, and the dust pollution control content is included, and the construction dust pollution control is taken as a part of the construction safety management, the specific content is:
Add "construction dust control measures" to the signs at the entrance of the site, and summarize the control content with concise words:
The project department is ready to accept the inspection and acceptance of superior competent authorities and environmental protection departments;
No waste incineration at the site; The wall shall not be removed before the end of the project, and prevention and control measures shall be taken for construction operations prone to dust generation.
Household garbage bagged, and timely cleaning; Centralized stacking of construction waste, timely removal;
The structure is surrounded by a dense safety net, the cement is put into storage, and the woodworking room is closed.
The site of the accumulation of earthwork compaction coverage, closed vehicles for transportation, site vehicles out for cleaning;
The enclosing wall is implemented around the site, and the site is all hardened;
Combined with civilized construction management, the implementation of site construction dust control, to ensure that the construction production does not cause dust pollution;
Do a good job of environmental protection, the project department in civilized construction commitment based on the control of dust again to the community commitment:
In order to do a good job in the control of construction dust and ensure the environmental standards, in addition to do a good job in the organization of construction work, we must do a good job in the internal propaganda and launch work, in order to enhance the environmental awareness of all staff, control dust pollution, to ensure the realization of management objectives.
The main control point of this pollution control and haze reduction is the implementation of "six hundred percent" and "seven in place" measures of dust control on construction sites under construction issued by Taiyuan City. The specific contents are as follows:
The project department and each construction team shall implement the responsibility of construction dust control with special position operators and formulate reward and punishment system to promote the process of construction dust pollution control.
Pollution control and haze reduction is a part of the performance appraisal of relevant personnel, and the project team members assess the management personnel according to the performance appraisal form.
The team leader shall be the construction dust control leader of the operation group, and must obey the command of the project department and actively control dust pollution.
All management positions must include the control of construction dust into the scope of the whole process of construction management, and strengthen management according to their own responsibilities.
The project manager is the first person responsible for the pollution control of construction dust and must be fully responsible for the pollution control and haze reduction control of the construction site.
<<
<
>
Twenty-six language translations
English translation Chinese
English translation traditional Chinese
English translation Japanese language
English translation Korean
English translation French
English translation Spanish
English translation Thai
English translation Arabic
English translation Russian
English translation Portuguese
English translation German
English translation Italian
English translation Greek
English translation Dutch
English translation Polish
English translation Bulgarian
English translation Estonian
English translation Danish
English translation Finnish
English translation Czech
English translation Romanian
English translation Slovenian
English translation Swedish
English translation Hungarian
English translation Vietnamese
Twenty-six language translations
English
中文
繁體中文
日本語
한국어
Français
Español
ไทย
العربية
Русский язык
Portugues
Deutsche Sprache
lingua italiana
Ελληνικά
Ολλανδικά
Polski
Bułgarski
Eesti keel
dansk
suomalainen
Česky
românesc
Slovenščina
Svenska
magyar
Tiếng Việt
Online translation support
English
,
Chinese
,
traditional Chinese
,
Japanese language
,
Korean
,
French
,
Spanish
,
Thai
,
Arabic
,
Russian
,
Portuguese
,
German
,
Italian
,
Greek
,
Dutch
,
Polish
,
Bulgarian
,
Estonian
,
Danish
,
Finnish
,
Czech
,
Romanian
,
Slovenian
,
Swedish
,
Hungarian
,
Vietnamese
, Translations in other languages。
Return home